
Lot 31
Active
Description
New Steel construction 14 m x 20 m
Galvanised steel;
Side column 5 m high;
The structure is made of IPE 160;
Frame spacing every 4 meters.;
The construction includes:
- side poles
- roof transoms
- wall braces
- roof braces
- gable columns
- bowstrings
- brace;
not include Z-profile for roof and walls.
Space need for loading
Lenght – 7,2 m
Wide – 2 m
Hight – 1 m
🏗️Construction & Earthmoving
Steel construction (14x20 m) (280 m2) - 2026
New 14x20m steel structure, 280m2. IPE 160 profile, 5m side columns. Includes poles, braces, and bowstrings.
Current Bid
5.600 €
Previous: 5.400 €
4 bid(s) placed
Price checked 02/09/2026, 14:29:02
Lot ends in
2m 24sAlso listed on
The same item is also being sold by another auction house.
Lot Details
- Lot #
- 31
- Currency
- EUR
- Bids
- 4
- Location
- Gostyn, PL
- Lot Ends
- 2 Sept 2026, 14:32:00
- Auction Ends
- 2 Sept 2026, 15:45:00
- Auction Started
- 13 Aug 2026
- Lots in Auction
- 74
