
Lot 14
Active
Description
New Steel construction 18 m x 35 m Galvanised steel Side column 7 m high The structure is made of IPE 240 Frame spacing every 5 meters. The construction includes: - side poles - roof transoms - wall races - roof races - gable columns - bowstrings - brace; Z-profiles for the roof/walls and fasting bolts, screws, and nuts are not included. Space need for loading Lenght – 9,5 m Wide – 2,3 m Hight – 1,5 m
🏗️Construction & Earthmoving
Steel constructions (18 x 35 m) (630m2) - 2026
New galvanized steel structure for 18x35m building (630m2). IPE 240 frames, 7m side columns.
Current Bid
8.300 €
Previous: 7.900 €
5 bid(s) placed
Price checked 01/09/2026, 12:58:12
Lot ends in
1d 1h 12mMain listing
This item is listed on several sites. We show it once, here:
Lot Details
- Lot #
- 14
- Currency
- EUR
- Bids
- 5
- Location
- Gostyn, PL
- Lot Ends
- 2 Sept 2026, 14:15:00
- Auction Ends
- 2 Sept 2026, 14:01:00
- Auction Started
- 13 Aug 2026
- Lots in Auction
- 74
