This auction has ended. Browse similar active lots below.
Lot 2
Sold
Description
GIVEN DOWN COMFORT – 5 ETACHMENT, 1 INSTRUCTION AND 10 SECTORS DESCRIPTION: The batch of components for GEDA construction and demolition drop pipes.GEDA drop pipes have been developed for the safe and efficient transport of construction waste from higher floors directly into the container. The system may be mounted on the stills, walls and flat or inclined roofs using associated attachment systems. The hunting pipes are manufactured in impact-resistant plastic and have a double suspension hook with chain. The lot consists of: - 5nd Middle/Taying - 1st peak input - 10th GEDA drop pipes - Suspension chains are included. Product information provided by the manufacturer: - Slip plastic construction - Dot suspension hooks for safe insertion - Can be mounted on the stills, wall, flat and sloppy roof - Comfort system with pipe length approximately 1,1 m per section - Wall thickness 6 mm with 3 mm wearer - Weight approx. 12 kg per shaft tube Sold together as one batch.
🏗️Construction & EarthmovingGEDA
GIVEN DOWN COMFORT – 5 ETACHMENT, 1 INSTRUCTION AND 10 SECTORS
GEDA Comfort debris chute system including 5 floor chutes, 1 top chute, and 10 shaft pipes for safe waste transport from heights.
Sold7 Sept 2026
Final Price
424 €(5 000 kr)
6 bid(s) placed
Lot Details
- Lot #
- 2
- Currency
- NOK
- Bids
- 6
- Location
- Kristiansand s, NO
- Lot Ends
- 7 Sept 2026, 15:54:00
- Auction Ends
- 7 Sept 2026, 15:54:00
- Auction Started
- 31 Aug 2026
- Lots in Auction
- 1
