Skip to content
LotSeekr
Layher scaffold used, hot-dip galvanized steel, 5 adjustment frames with accessories
Active

Description

A used scaffolding by Wilhelm Layher GmbH & will be auctioned Co. KG, system "flash scaffold" made of hot-dip galvanized steel (scaffolded floors with aluminium frame and plywood/screen printing coating). Total weight according to manufacturer parts list 333.80 kg.   Components:  5 semi-high frame, height 1,00 m, width 0,73 m  2 railing frames 1 L-frame crossbars for railings, length 3,00 m  2 crossbars for railings, length 2.50 m  1 crossbar for stability, length 3,00 m  1 crossbar for stability, length 2.50 m  1 diagonal, length 3,00 m  1 diagonal, length 2.50 m  4 footspindles & nbsp; 4 rolls 2 scaffolding floors plywood, length 3,00 m  1 scaffolding floor plywood with passage and ladder, length 3,00 m  1 scaffolding floor plywood, length 2.50 m  4 Fastening clamps & bsp; 14 safety bolts & nbsp;   Note: Boardboards are not included.    Current status in detail: Steel parts (frames, crossbars, diagonals): hot galvanizing surfaced and intact, age-related matte. Traces of use in the form of scratches, adhesions of paint and mortar sprays as well as varnish and adhesive bang on several components. No visible deformations, dents or cracks. Scaffolded floors: surface strongly designed for use, large-scale paint splashes and worn surface; floors complete and durable, aluminum frame without visible damage. Foot spindles: functional, thread running, reddish attachments to the threads. Rolls: 4 pieces, controllable with brake, running surfaces with paint and mortar residues, functional. Small parts (fixing clamps, safety bolts): Fully according to installation, with colour adhesions and usage checks.  Boards for the floors are not available.    The scaffold was last built and was disassembled for the photos; the pictures show the actual delivery and condition.    CE marking: A CE marking is not available. Facade scaffolding components are not subject to CE marking requirements; the system is subject to general building supervision approval Z-8.1-16.2. The authorisation is not attached to the public and can be viewed on request.    Collection: The item is to be taken as a collection item. Location and collection in Stuttgart. The date shall be agreed with the supplier after the contract has been awarded. Means of transport (trailer or transporter) shall be provided by the acquirer himself. 
🏗️Construction & EarthmovingLayher

Layher scaffold used, hot-dip galvanized steel, 5 adjustment frames with accessories

Used Layher Blitzgerüst scaffold system, 333.8kg total weight. Includes 5 galvanized steel adjustment frames, rails, and aluminum decking.

Current Bid

165 €

Previous: 80 €

3 bid(s) placed

Price checked 01/09/2026, 21:58:28

Lot ends in

19d 22h 44m
Bid on Zoll-Auktion

Lot Details

Currency
EUR
Bids
3
Location
Stuttgart, DE
Lot Ends
22 Sept 2026, 00:01:00
Auction Ends
22 Sept 2026, 00:01:00
Auction Started
1 Sept 2026
Lots in Auction
1

Similar Lots