Skip to content
LotSeekr
Various equipment Pipe mast 3 directed
Active

Description

Tube mast 3 led in heavy iron. Section 1, 9 metres 2 section 6 meters. 3 section approx. 2 meters. Diameter of bottom section 0.65 cm. See pictures for condition.
🏗️Construction & Earthmoving

Various equipment Pipe mast 3 directed

3-section steel pipe mast, total height approx 17 meters, heavy iron construction.

Current Bid

No bids

Lot ends in

4d 3h 55m
Bid on Retrade

Lot Details

Currency
DKK
Lot Ends
30 Sept 2026, 17:00:00
Auction Ends
30 Sept 2026, 17:00:00
Lots in Auction
1

Similar Lots