Skip to content
LotSeekr
This auction has ended. Browse similar active lots below.
Silokallio camp centre on the shore of Lake Joutsijärvi, Ulvila
Sold

Description

Silokallio camp centre on the shore of Joutsijärvi.The destination for sale is located at Silokakalliontie 160, 29340 Gold. Surface of the property to be sold 20ha. The space to be sold is limited from approximately 370 metres to Lake Swan. R-1. The block area of buildings serving holiday and course activities and the VP. Park. The farm is located in Pori's Evangelical Lutheran Parish Union, where the operation was completed.Buildings Main buildingPrepared in 1983Story hall approximately 1187m2Tiili/container body/tile curtainSurvey roof/bitum cream roofCategory heating (oil), separate heating centre, from which the thermal canal building is managedThe operating class of the building: the parish houseThe building has facilities on two floors; e.g. dining room, kitchen, office space, fireplace room, lecture hall and technical spaceThe most essential measures recommended by the building based on moisture mapping (as an attachment file) are:the installation of an insulating waterproof area for underground parts of the building. Installation of a spherical layer on the side of the building where there is no asphalt. Installation/saneration of underground components of the drainage and rainwater system. Installation of roof public windows with smeg and edgeboards. Maintenance painting of windows and doors. Further research recommendations based on the survey: Conditional and maintenance repair of Facade and Subbase. It's a good look at the roof. Intensity measurement in connection with a façade fitness study to determine air leakage routes. Accommodation building 1Prepared in 1983Story hall approx. 856m2Wood frame/tile claddingGarden roof/bitum cream roofElectrical heatingWeight air, mechanical exhaust airThe building's operating category: other accommodation business buildingsIn construction facilities on one floor, mm 10 accommodation rooms with washrooms, two so-called multipurpose spaces and two kitchens in the building (hotel buildings) On the basis of a moisture technical study (as an appendix file), the summary section of the report states: A new destination visit to accommodations 1, 2 and 3 was carried out on 30.1.2026, which looked at the buildings organoleptically. In addition, indicative measurements were made on the surface of the space for the purpose of updating the report.It is estimated that the condition of the site has remained unchanged and that the conclusions of previous studies are still the same. No new moisture stress findings were observed in the accommodation buildings by organoleptic or surface humidity indicator. Floor covering materials and technical solutions in the shower rooms of buildings have exceeded their technical lifetime and are recommended to replace them (RT 103765). In addition, it is recommended to carry out moisture measurements in accordance with the relative humidity measurement of ‘Rt card concrete (2021) 103333’ at the time of possible renovation in order to determine the drying needs of the floor plate. The premises have been unused for a long time, so it is not possible to estimate the moisture burden during use using a surface humidity indicator in the areas affected by the waterspots.Mainbuilding 2Prepared in 1983Salary hall approx.829m2Wood frame/tile claddingBreed roof/bitum cream roofElectric heatingWeighing inlet air, mechanical exhaust accommodation building premises on one floor, including 10 accommodation rooms with washrooms, two multipurpose rooms and two kitchensAccommodation building 3Prepared in 1983Story hall approx. 225m2Wood frame/tile claddingBreed roof/bitum cream roofElectrical heatingWeight air, mechanical exhaust accommodation building premises on one floor, three apartments, with own washroomsCable buildingCompiled in 2008Story hall approximately 63m2Pulpet roof/bitum cream roofElectrical heatingIndoor inlet and exhaust airCreatement class: Religion-refining buildingsThe chapel in the building was completed in camp use. the most relevant measures recommended on the basis of the moisture mapping (as an attachment file): installation of a layer of shards on the side of the building where vegetation is present. Repair of façade wooden parts. Limbing of reproducible pads under the edge sheet. Further research recommendations based on the survey: Spot-checking of the condition of the roof outside the freezing season. Examining the existence of a base wall disc. Sauna buildingCompleted in 1983Story hall approximately 179m2Wood frame/board coveringBreed roof/tile roofElectrical heatingWeight air conditioningCurrent ventilationCurture operating category: sauna buildingsIn building rooms on one floor, two saunas, two washrooms, 2 dressing rooms and a fireplace roomThe moisture mapping carried out in the building (as an attachment file) the main recommendations for action adopted on the basis of which: the installation around the basic wall of water in order to prevent the transfer of soil moisture. Installation of a layer of shards on the side of the building where vegetation is located. Installation/saneration of underground parts of the drainage and rainwater system. Repair of façade and window wooden parts. Further study recommendations based on the survey: Spot-checking of the condition of the roof outside the freezing period. Examining the existence of a base wall disc. Exploiting the existence of a secretive system. Further research recommendations on the basis of the survey: Further research on ground pressure walls of basic walls. A more detailed assessment of the condition of the roof, pass-throughs, edge coverings and shipbuildings. To carry out moisture measurements during any renovation (Rt103333 relative humidity measurement of concrete). In addition, warehouses, barbecue canopy and heating centre in connection with the main building.The building has water supply and sewerage connections in the city of Ulvila. The electricity connection of Caruna Oy. In the attachments, the HVAC drawings of the property.In the annexes, studies carried out in buildings and the PTS structural and technical operations report, to which the buyer must consult before making the offer. All the recommendations for measures, the need for measures and the costs involved in the checks and reports remain to be borne by the purchaser. The seller shall not be liable for defects or defects in the building after sale or for structures or materials involving additional dismantling costs, whether faults, defects or additional costs are related to structural factors, the suitability of the construction method, the possibility of access to the building, the declared surface areas, moisture, mould, fungi or decay, or other quality defects or defects, e.g. in building foundations, drainage, drainage or drainage, water or moisture insulation, other insulation, hull, sub-, upper or intermediate base, façades, roofs, walls, surfaces, windows, doors, other equipment or furnishings of the building, defects or defects in water, electrical, sewage or other wiring/assemblies, ducts/climates, electrical or heating systems or other instruments or appliances. The buyer is responsible for the property and cleaning left by the seller in the building. The seller is not responsible for the suitability of the current purpose of the transaction for the intended use of the buyer. The buyer is responsible for all possible uses.
🏠Real Estate

Silokallio camp centre on the shore of Lake Joutsijärvi, Ulvila

Silokallio camp centre on Lake Joutsijärvi, Ulvila. 20ha plot. Main building 1187m2. Commercial/holiday use.

Sold18 Oct 2026

Final Price

200.000 €
Bid on Huutokaupat.com

Lot Details

Currency
EUR
Location
Ulvila, FI
Lot Ends
18 Oct 2026, 17:00:00
Auction Ends
18 Oct 2026, 17:00:00
Lots in Auction
1

Similar Lots